News Stay up to date We are hiring. Join our team! September 9, 2024 Lisbon Metro: Contract for the Design and Construction of the Extension of the Red Line between São Sebastião and Alcântara, of the Metropolitano de Lisboa, E.P.E. – Proc. No. 125/2022-DLO-ML September 4, 2024 The Integrated Information System of the Electronic Register of Companies Performing Public and Private Projects, Designs, as well as Technicians and respective scientific services (ΟΠΣ ΜΗ.Τ.Ε.) has commenced operating. June 26, 2024 Hand-over of Road Axis Kalloni – Sigri, Lesvos island, Northern Aegean, Greece April 19, 2024 Construction of the provincial road axis from Kastoria to Ptolemaida (Northwestern Greece): Road stretch from Kotouri stream to Kozani prefecture borders, including a highway tunnel in Kleisoura area. Elaboration of implementation designs. April 19, 2024 5* & 4* Hotel Complexes, at Syvota Thesprotia, Northwestern Greece. Preliminary and detailed designs. April 19, 2024 Improvement works of the road axis Lamia – Itea – Antirrio (Central Greece), Road stretch: from Gravia to the Junction at the Bauxite Mining facilities. Elaboration of preliminary and detailed designs. April 19, 2024 HELIOS Hotel Complex, Agia Marina Eastern Attica, Greece. Elaboration of designs for the infrastructure / civil engineering works for the creation of a fully functional 34,550 m2 hotel complex. April 12, 2024 Southwestern Peloponnese Axis, Kalamata – Rizomylos – Pylos – Methoni Stretch (Public-Private Partnerships Unit). Geological, Geotechnical and Structural Designs. Final and Implementation Designs. April 12, 2024 Northern Road Axis of Crete (V.O.A.K.) Design, construction, financing, operation and maintenance of the Hersonissos – Neapoli stretch (Public-Private Partnerships Unit). Geological, Geotechnical and Structural Designs. Preliminary, Final and Implementation Designs. April 12, 2024 Highspeed Railway Line Brasov – Simeria, Track Section Brasov – Sighisoara Subsection: 2 Apata – Cata”, Design and Construction of the Longest TBM Railway Tunnels in Romania March 11, 2024 New contract assignment for the elaboration of final detailed designs for the project: «Designs for the construction of the new road axis Arfara – Lampaina, Messinia Region”. March 10, 2023 New Contract Assignment: «Design, Construction and Completion of UG Stations and Tunnels (TBM and NATM), Cut & Covers, Entries & Exits, TBM Retrieval Shafts and Associated Works for Surat Metro Rail Project, Phase-I (UG02/PCG-CS3)» March 2, 2023 Design Contract Assignment for the Project: Transformation into a Motorway of the Northern Road Axis (VOAK) of Crete section: Neapoli – Agios Nikolaos, Lasithi Regional Unit, Southern Greece February 28, 2023 New contract assignment from Egnatia Odos S.A. Contract No 5974 – S2 Tunnel February 24, 2023 New contract assignment from Egnatia Odos S.A. Contract No 5983 – S3 Tunnel February 24, 2023 New contract assignment from Egnatia Odos S.A. Contract No 5943 February 24, 2023 Thessaloniki Metro / Venizelou Station February 10, 2023 Design Contract: Highspeed railway line Brasov – Simeria, Section 1: Braşov – Sighişoara: LOT1: Brasov – Apata & LOT3: Căţa – Sighişoara”, Romania November 23, 2022 Design Contract: Highspeed railway line Brasov – Simeria, track section Brasov – Sighisoara subsection: 2 Apata – Cata”, Romania November 16, 2022 Development of 3 open-cycle gas turbine (OCGT) power plants (299 MW each) in UK November 4, 2022 VENIZELOU station – Thessaloniki Metro October 3, 2022 New contract assignment from TATA PROJECTS LTD for National Highways Authority of India (NHAI). “Detailed Designs (Geological, Geotechnical, Structural, Highway and MEP) and Site Support Services for a twin bore tunnel (2*4.23km), a cut & cover structure, retaining structures, slope protection, drains, culverts, cross passages/lay bays for Ramban to Banihal Highway Section of Nh-1A (Package I)”. September 6, 2022 New contract assignment from Central Macedonia Region / Serres Region. “Structural adequacy checks of structures and bridges along the provincial and national road network of Serres Region”. September 6, 2022 New contract assignment from Peloponnese Region. “Coast Line Connection of Kalamata and Messini municipalities and design of a new bridge at Pamisos River”. June 9, 2022 Construction works for the rehabilitation of settlements and stability issues at Limnes (Lakes) Pissouri area, Limassol Cyprus have begun. April 14, 2022 New publication: “Going underground for ferronickel mining in Greece: Preliminary feasibility and potential benefits” November 16, 2021 Design classification degrees extension until 31/12/2022 July 31, 2021