Hand-over of Road Axis Kalloni – Sigri, Lesvos island, Northern Aegean, Greece
April 19, 2024
The Kalloni – Sigri road axis (Lesvos island), of total length of 46.7 km, was handed over today. A special event took place in Lesvos Island, in the presence of the Prime Minister, the Minister of Infrastructure and Transportation, the Deputy Minister of Infrastructure and Transportation and the President and CEO of AKTOR.
Geotechnical designer of a road stretch: OMIKRON KAPPA CONSULTING S.A.
Contractor: Joint Venture AKTOR S.A. – ANASTILOTIKI S.A.