Water Management Works for production of Electric Power – MYHE RRAPUN 3 & 4, in Albania.
Geological / Geotechnical Investigation Report (GIR), final (detailed) design of temporary support and final lining, including portals, provision of specialized technical services for the following tunnels:
– Pressurized Hydraulic Tunnel A, for water transfer from Rrapunit river dam to the electric power production station
Total length 2,310m, effective cross section 21.0m²
Construction method: NATM- Mechanical means & Drilling and blasting
– Hydraulic Tunnel B, for the diversion of the Qarrishte river runoff to the dam basin
Total length 200m, effective cross section 21.0m²
Construction method: NATM- Mechanical means & Drilling and blasting
CLIENT
AKTOR SHOQERI ANONIME TEKNIKE
LOCATION
Albania
SCOPE
Tunnels / Hydraulics