New Double High Speed Railway Line Lianokladi – Domokos, Greece (2007-2011)
Details
New Double High Speed Railway Line Lianokladi – Domokos, Greece
Services provided:
1. Final detailed designs and provision of consulting services during the construction of SS6 Twin Bore, Single Track Railway Tunnel {length 14,088m (R.B. 7,018m and L.B. 7,070m), exc. cross section 120m², thirteen (13) cross passages (length 870m) and two (2) adits (length 1,650m)}.
2. Final detailed designs and provision of consulting services during the construction of SS5 Single Bore, Double Track Railway Tunnel (length 427m, exc. cross section 140m²).
3. Geotechnical evaluation of pier’s foundation conditions.
4. Geotechnical designs from the replacement of railway bridges with embankments.
5. Final geotechnical design for the rehabilitation of slope failures.
6. Final geotechnical landslide study.
7. Final geotechnical design railway embankments and cuts, overpasses and underpasses.
8. Review, technical checking of the final designs and final detailed designs of the railway tunnel SS13 (length 357m, exc. cross section 135m²), SS14 (length 258m, exc.cross section 135m²), SS12 (length 309m, exc.cross section 150m²), SS9 (length 300m, exc. cross section 150m²).
CLIENT
Construction companies
LOCATION
Central Greece
SCOPE
Railway Tunnels / Earthworks