Diez Highway Tunnel BIM Model and Formwork Drawings Production, Germany (2018-2020)
Details
Diez tunnel of B417 highway in Central Germany, 335m total length, underground section 133.5m long. BIM Model elaboration, production of detailed formwork drawings for the mined section and 3D surface model for optimized design of portals.
CLIENT
EDR GmbH
LOCATION
Diez, Germany
SCOPE
Tunnels / BIM