
New contract assignment from TATA PROJECTS LTD for National Highways Authority of India (NHAI). “Detailed Designs (Geological, Geotechnical, Structural, Highway and MEP) and Site Support Services for a twin bore tunnel (2*4.23km), a cut & cover structure, retaining structures, slope protection, drains, culverts, cross passages/lay bays for Ramban to Banihal Highway Section of Nh-1A (Package I)”.
September 6, 2022
Designer: «OMIKRON KAPPA – INDUS CONSULTRANS Joint Venture», India.