Profile

Quality management

Fields of specialization

Corporate governing

Organization chart

Company's strategy

Collaborating companies

Company's headquarters

 

 
 

 

 

 

  Company profile - Corporate governing


Curriculum vitae

1.   Name:                                PANAYOTIS

2.   Surname:                           KONTOTHANASSIS

3.   Date and place of birth :   1966, ATHENS

4.   Nationality:                       GREEK

5.   Marital status:                   MARRIED

6.   Education :

 

INSTITUTION:

 

National Technical University of Athens (NTUA)

Date:

From (months/years)

To (months/years) 

 

1984

1989

Degree(s) or Diploma(s) obtained:

 
Mining Engineering

INSTITUTION:

 

University. Of South Wales, Gr. Britain

 

Date:

From (months/years)

To (months/years) 

 

1992

Degree(s) or Diploma(s) obtained:

Postgraduate intensive course on "Mineral Deposits of Europe"

INSTITUTION:

 

National Technical University of Athens (NTUA)

Date:

From (months/years)

To (months/years) 

 

 

1994

Degree(s) or Diploma(s) obtained:

PhD in Mining Engineering (Mine Ventilation, Data Acquisition and Control System in Underground Environment)

7.  Languages (1 basic  5 - excellent):

 

Language

reading

speaking

Writing

Greek

5

 5

 5

English

5

5

5

French

3

3

2

8.  Participant in professional bodies:

-          (Technical Chamber of Greece)

9.  Present position:

Vice President of the Board of Directors  and Scientific member of OMIKRON KAPPA CONSULTING S.A.

10. Years of professional experience: 23

11.  Key qualifications: 

  • Geotechnical engineering, soil / rock engineering

  • Tunnel design

  • In situ geotechnical monitoring and rock mass behavior testing

  • Tunnel Construction planning and management

  • Public procurement

  • Environmental Impact Analysis (EIA) processes

  • Design and Build Procedures

  • Ventilation of underground openings

  • Underground Mine Atmosphere Monitoring

  • Rock reinforcement techniques and underground openings' support selection (rock bolting, rock anchoring, steel sets)

  • Stress and displacement analysis and numerical modeling of underground openings

12.  Professional employment:

Time duration: Since 1996

Country: Greece

Name of Enterprise Service: Vice President of the Board of Directors and Scientific member of OMIKRON KAPPA CONSULTING S.A.

Position in the Enterprise  Service: Scientific member

Duties responsibilities:

Coordinator and Responsible Engineer of study teams in the various designs of the company.

Project design.

Final check of the drawings and reports before their submission to the employer.

 

Time duration: From 1990 until 1996

Country: Greece

Name of Enterprise Service: Freelancer

Position in the Enterprise  Service: Consulting engineer

Duties responsibilities: Rock and geotechnical engineering issues

 

Time duration: From 1990 until 1996

Country: Greece

Name of Enterprise Service: Mining technology laboratory of National Technical University of Athens (NTUA)

Position in the Enterprise  Service: Scientific investigator

Duties responsibilities: Issues of geotechnical design of underground works

 

Time duration: From 1990 until 1996

Country: Greece

Name of Enterprise Service: National Technical University of Athens (NTUA), department of Mining engineering

Position in the Enterprise  Service: Benefit of instructive work

Duties responsibilities: Section of underground works construction, tunnel shoring, underground pulling up and transport, pumping of water and airing of underground works

13.  Publications

1. J. N. ECONOMOPOULOS,

    P.T. KONTOTHANASSIS,

    N.J. KORONAKIS

Training requirements of the community mining industries, Comett European Program, Eurometaux Federation, Feb. 1992, Brussels.

 

2. J. N. ECONOMOPOULOS  

    and

    P. T. KONTOTHANASSIS

Applications of Expert Systems in mining - Choice of the main transportation method in an underground mine, Special Issue of National Technical University of Athens, 1992, Greece

3. J. N. ECONOMOPOULOS   

    and

    P. T. KONTOTHANASSIS

Contribution to the study for the development of Data Acquisition and Control systems in mining, Mining and Metallurgical Annals,  Vol.2, No3, 1992, Greece

4. J.N. ECONOMOPOULOS,

    N.J. KORONAKIS,

    P.T. KONTOTHANASSIS,

    J.K. MICHALELIS,

    D.H. KOTINIS

Underground innovative mechanized bauxite mining under difficult conditions die to existence of karstic voids 2nd Symposium on Mine Mechanization and Automation, Lulea, June 1993, Sweden

 

5. J.N. ECONOMOPOULOS,

    N.J. KORONAKIS,

    P.T. KONTOTHANASSIS,

    J.K. MICHALELIS,

    D.H. KOTINIS

"Mining of a thick inclined bauxite deposit by a modified sublevel caving method under marginal conditions of the surrounding rocks' characteristics", Third Intl. Symposium on Mine Planning and Equipment Selection, 1994, Turkey.

6. P. T. KONTOTHANASSIS

Automatic air quality monitoring in diesel-powered underground mines, Doctoral Thesis, National Technical University of Athens, 1994, Greece.

7. J.N. ECONOMOPOULOS,

    A.I. SOFIANOS,

    N.J. KORONAKIS,

    P.T. KONTOTHANASSIS,

    D.H. KOTINIS

"Real time stability control in underground room and pillar mining", Intl. Congress on Rock Mechanics, Tokyo, 1995, Japan.

 

8.  J.N. ECONOMOPOULOS,

      A.I. SOFIANOS,

      N.J. KORONAKIS,

      P.T. KONTOTHANASSIS,

      D.H. KOTINIS

 

Problems related to the installation of a Data Acquisition and Control System for Geomechanical Measurements in an underground Bauxite Mine, Intl. Congress on Field Measurements in Geomechanics, Bergamo, 1995, Italy.

9. P.T. KONTOTHANASSIS,

    J.N. ECONOMOPOULOS

Estimation of the Air Quality Index in the case of operation of numerous Diesel-powered units in Greek underground bauxite mines, 4th International Symposium on Mine Planning and Equipment Selection, 1995.

 

10. J. N. ECONOMOPOULOS  

      and

      P. T. KONTOTHANASSIS

Agios Nikolaos tunnel Design and selection of the construction method, The tunnels of Egnatia Highway, 1st Scientific Symposium, Ioannina, 1999, Greece.

11. J. BOURNAZOS,

      P. DELAPOGLOU,

      P.T. KONTOTHANASSIS

Driskos tunnel - construction experience, construction progress and design elements, The tunnels of Egnatia Highway, 2nd Scientific Symposium, Ioannina, 2001, Greece.

12. N. KORONAKIS,

      P. KONTOTHANASSIS,

      J. BOURNAZOS

Special design methods for construction of tunnel portals in areas with extremely steep morphology, Underground Space for Sustainable Urban Development, Proceedings of the 30th ITA-AITES World Tunnel Congress, 22-27- May 2004, Singapore.

13. N. KORONAKIS,

      P. KONTOTHANASSIS,

      N. KAZILIS,

      N. GIKAS

Stabilization measures for shallow tunnels with ongoing translational movements due to slope Instability, Underground Space for Sustainable Urban Development, Proceedings of the 30th ITA-AITES World Tunnel Congress, 22-27- May 2004, Singapore.

14. N. KORONAKIS,

      P. KONTOTHANASSIS,

      D. KATSARIS

 

Design of water isolation grouting for reducing high water inflows in urban shallow tunnels, Proceedings of the 31st ITA-AITES World Tunnel Congress, Istanbul, May 2005, Turkey.

15. N. KORONAKIS,

      P. KONTOTHANASSIS,

      A.KARINAS

      S. MASSINAS

 

Design and construction of NATM underground station tunnel by using the fore poling method in difficult conditions for Athens Metro, Proceedings of the 31stITA-AITES World Tunnel Congress, Istanbul, May 2005, Turkey.

16. N. KORONAKIS,

      P. KONTOTHANASSIS,

      D. KATSARIS

      G. EGER

      W. RAUSCHER

 

Design considerations and special construction method for a shaft and main tunnel junction at Athens Metro Geoponiki shaft, Proceedings of the Underground Construction Congress, London, October 2005, Great Britain.

17. N. KORONAKIS,

      P. KONTOTHANASSIS,

      S. MASSINAS

 

 

Design and construction of an underground station tunnel with interconnected galleries for achieving high advance rates and controlling settlements, Proceeding of the Underground Construction Congress, London, October 2005, Great Britain.

18. N. KORONAKIS,

      P. KONTOTHANASSIS,

      J. BOURNAZOS

 

Applied fast track approach in tunnel designs: Lessons Learnt, Intl. symposium on Practices and Trends for Financing and Contracting Tunnels and Underground Works, ATHENS March, 22-23 2012, Greece.

PANAYOTIS KONTOTHANASSIS
 

 

 

 
 
     Site map  |  Legal Notice  |  Favorite  |  Print  |  Mail-It                                                                                       | 

 

Powered by - ICN